ETS Drift Ute – The final tare down begins

IMG_8694

This monday was a PDO from work which gave me the perfect opportunity to get some work done. The plan was to get the motor out first to send the manifold off for ceramic coating, in a couple of hours all the bodywork was removed and the motor was on the floor.

IMG_8683

I love the fact its so easy to work on, with the front intercooler and oil cooler assembly removed with only 4 bolts everything is easily accessible

IMG_8664

A lot of work went into this and I couldn’t be happier with the results

IMG_8706

Now to get this chassis bare and send it to the powdercoaters.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>