Drift Ute

ETS Drift Ute – Caster rod mechanics

This time last week the ute was sliding of the jig and into a rolling state, the one thing missing was caster arms to position the wheel where it needed to be, tonight after many hours in the shed we ...

ETS Drift Ute – A busy Saturday review

In the middle of a cold victorian winter the forecast was clear for saturday, i spent the entire week working for this day and i had my fingers crossed it was to be clear enough to spend the morning o...

ETS Drift Ute – On any Sunday

Having two days to get stuck into the ute build is just what i and it needed. Waking up after a great sleep i didnt plan to do much today but i had a few ideas, the tools and the material to give it a...

ETS Drift Ute – Just another Saturday

Today was a busy day, i headed out to G Works custom cycles last night to pick up another 6 meters of tube my good friend Luke ordered in for me and then the rest was a blur, read on for a day in the ...

ETS Drift Ute – Strut tops

You wouldnt believe how many measurements, drawerings and templates go into a build like this, tonight was dedicated to strut tops, now to replicate the paper into steel.

Build Blog on Speedhunters

Massive thanks to Casey for posting up my part 2 build blog, please head over and have a read at speedhunters

ETS Drift Ute – Moving along nicely

Massive thanks to MCA Suspension artists Murray and Josh Coote for the coilovers, they are scheduled to arrive this week and bring it another step closer to rolling under its own spring pressure. Ever...

ETS Drift Ute – 2 Steps forward 1 step back

After weeks of measuring and re-measuring i decided to rework the floor design. I have an RB25 gearbox for it and it was a tight fit in the tunnel, i couldnt “extend” the tunnel as it woul...

ETS Drift Ute – Bracketry

I finally worked out where my pedals needed to be so i fabricated the bracketry needed.