Length: 4 minutes|Difficulty: Standard During the shell preparation process, we need to think about the location and the size of our roll cage footings. In a lot of roll over protection guidelines, a recommended surface area for our footings will be clearly stated in the regulations — these should be 100 percent confirmed before going […]

Back to: Roll Cage Fabrication Skills Course > Shell Preparation
Lesson Details
Length
4 minutes
Complexity
Standard
Previous Lesson
Next Lesson