In Part 4 we begin the construction of the primary tubes that will feed the merge collector with high flowing exhaust gasses. During this Part 4 we take our 90 degree Stainless Steel bends, cut and weld them into position making sure that we consider the flow characteristics of the primary tubes. Throughout this Part 4 […]