Hilux

ETS Drift Ute – The Front Bar Work

The front tube work is finally taking shape, after running out of tube my new order has arrived and its full steam ahead.

ETS Drift Ute – Bracketry

I finally worked out where my pedals needed to be so i fabricated the bracketry needed. 

ETS Drift Ute – The build rolls on

Progression: the act of progressing; forward or onward movement.

ETS Drift Ute – Running out of Tube!

This project has been in the thought process for a good 4 years now, to see it evolve after every hour spent working on it is awesome. Every meter of tube that goes into it is another step forward.  T...

ETS Drift Ute – Work Smarter not Harder

As far back as i remeber ive had a thing for roll cages, peering inside race cars and seeing bars going left right and center stirs emotions within. Building these structures has alweays been a thing ...

ETS Drift Ute – Hanging pedals

After bolting together the wilwood pedal assembly i quickly made a hanging bracket to tack it to the cross bar, this wont be the final position as i need it rolling to get the pedal as close to the fi...

ETS Drift Ute – At the bar!

Last night i managed to squeeze a few solid hours into the ute build, i managed to get the door intrusi0ns in, the taxi bar for the harnesses, the top window bar in and the pedal box tacked in, this p...

ETS Drift Ute – More bar work

Its a good feeling to be progressing at this rate, with a date set for international media and competition i cant afford to slack off. 15 meters of 1 3/4 tube is already used up and now im on to the 1...

ETS Drift Ute – Pedals arrive

My pedals and master cylinders have arrived after a long trip over from the USA. Looking forward to getting them positioned and plumbed up. You just cant go past Wilwood if your on a budget but still ...