ETS Drift Ute – Strip Down

IMG_8874

Since getting home from Brisbane I have been chipping away at getting this back to a bare frame for powder coating.

IMG_8878

The test run on the clear powder coated BMX frame is going well. Its a great feeling screwing everything together even when its only on two wheels, this rides so incredibly smooth now.

IMG_8877

Tomorrow morning ill be removing the rear suspension and diff, after that the body will lift off and its time to prep and send it to the powdercoater.

IMG_8865

I took the moulds down to the boys at IPTA Geelong and they whipped up another set of panels for me, these will be painted at the same time the rest of them will, then they will be saved as spares, fingers crossed I wont need them for a while.

IMG_8872

The rocker cover and manifold are at HiOctane Coatings getting prettied up.

So keen to screw this all together and have it finished.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>